Inside Lyon Part-Dieu railway station, a lightweight subfloor was made with POLITERM® BLU, laid on a separation sheet and levelled with a straightedge. The lightness of the EPS bead concrete made it possible to reach the required levels while limiting the loads on the existing structure.
SHARE