TRENITALIA MAINTENANCE FACILITY

R 60 and R 120 passive fire protection of steel structures and composite steel deck floors in the new Trenitalia maintenance facility at Torino Smistamento.

For the new high-speed maintenance facility of Trenitalia at the Torino Smistamento site (clients Trenitalia S.p.A. and Vianini Lavori S.p.A.), PROTHERM LIGHT® was sprayed with a plastering machine on steel structures and composite steel deck floors, over about 63,100 m² (679,202 ft²). Thicknesses of 10 mm (13/32 in) for R 60 and 20 mm (2 3/8 and 13/16 in) for R 120 kept the loads on the structure low; the product was also chosen for its weather resistance, as the ceiling was exposed. The work took about nine months and 332 pallets of product.

SHARE

Trenitalia maintenance facility
Trenitalia maintenance facility
Trenitalia maintenance facility
Trenitalia maintenance facility
Trenitalia maintenance facility

KEEP IN TOUCH WITH US

Sign up for our newsletter and stay up to date on technological innovations in the field of construction.

loading